LogoGPT Image 2 AI
ForsideAktiver
Creation
AI VideoAI ImagePrompts
  1. Forside
  2. GPT Image 2 Prompts Library
  3. Side 57
Prompt Library

GPT Image 2 Prompts Library · Side 57

Gratis, klar-til-kopiér GPT Image 2-prompts til text-to-image-generering — kurateret fra X, YouMind og det bredere community.

Explore 700+ hand-picked GPT Image 2 prompts for posters, infographics, illustrations, and product mockups. Copy, tweak, and run each prompt in one click — reference images included where needed. Side 57 af 64.

Kopiér en hvilken som helst prompt nedenfor og kør den direkte i vores AI-billed-workspace.

1.526 prompts44 kategorier1.241 med referencer6 fremhævede

Viser 1345-1368 af 1526

Reference

Anime Girl Smug Peace Sign Portrait

Generates an anime-style portrait of a girl making a peace sign with customizable hair, eyes, and background colors.

Af studioあぽろん
16.4.2026
GPT Image 2 Prompt
An anime-style illustration of a young girl with {argument name="hair color" default="silver"} hair styled in long twin tails secured with black ribbons, and {argument name="eye color" default="pink"} eyes. She has a {argument name="expression" default="smug smile with a slight blush"} and is looking directly at the viewer. She is posing dynamically, leaning forward slightly with one hand making a peace sign near her cheek and the other hand resting on her hip. She is wearing a white long-sleeved blouse featuring ruffles down the center and at the cuffs, a black ribbon tied at the collar, and a black high-waisted skirt with a ruffled hem and corset-style lacing. The background is a solid {argument name="background color" default="vibrant pink"} with a subtle vignette effect. The art style is high-quality, detailed anime illustration with soft lighting and glossy hair highlights.
Reference

Anime Girl in Space Elevator

Generates an anime-style illustration of a character looking up at a massive space structure from inside a glass elevator.

Af らけしで / Mizmic Studio
16.4.2026
GPT Image 2 Prompt
A high-angle, anime-style illustration of a girl with {argument name="hair color" default="long dark hair with purple tips"} standing inside a futuristic glass elevator, looking up at a massive space elevator structure. She is wearing a {argument name="outfit" default="sailor uniform with a pleated skirt and thigh-high socks"}. The elevator cab has metallic railings, glowing cyan accents, and a digital display showing an upward arrow and the text "{argument name="altitude text" default="005829 km"}". Through the large glass ceiling and windows, a colossal, intricately detailed space station with a central pillar and a large ring structure is visible against a backdrop of a starry sky and the curvature of {argument name="planet" default="Earth"} with clouds below. The lighting is dramatic, emphasizing the vast scale of the space structure and the atmospheric perspective.

Historical Social Media Feed Mockup

A creative prompt to generate a fictional Twitter-like (X) social media feed showing a historical argument between General Yi Seong-gye and General Choe Yeong.

Af Neotype
16.4.2026
GPT Image 2 Prompt
Please create an X page for {argument name="person" default="Taejo Yi Seong-gye"} (depicting the moment {argument name="context" default="just before the Wihwado Retreat"} - including posts where he and {argument name="opponent" default="General Choe Yeong"} are dissing each other).
Reference

Anime Noodle Advertisement Banner

Generates a vibrant, text-heavy Japanese promotional banner featuring an anime character, a product mockup, and a steaming bowl of noodles.

Af 結パパ
16.4.2026
GPT Image 2 Prompt
{
  "type": "Japanese promotional banner advertisement",
  "background": "vibrant red with subtle sakura cherry blossom patterns and gold confetti",
  "character": {
    "style": "anime",
    "appearance": "young woman with long black braided hair, wearing a fox mask on the side of her head",
    "outfit": "{argument name=\"character outfit\" default=\"red and white miko shrine maiden dress with decorative knots\"}",
    "pose": "winking, smiling energetically, pointing at the product cup"
  },
  "product": {
    "description": "instant noodle cup mockup",
    "design": "red and white packaging with 'COP NEEDLE' and '醤油味' text"
  },
  "food_shot": {
    "description": "large steaming bowl of ramen noodles",
    "toppings": ["3 shrimp", "cubed meat", "half boiled egg", "scallions", "yellow egg bits"]
  },
  "typography_and_layout": {
    "text_elements_count": 8,
    "elements": [
      { "position": "top-left starburst", "text": "{argument name=\"top left burst text\" default=\"新発売!\"}" },
      { "position": "top-center huge 3D title", "text": "{argument name=\"main product name\" default=\"コップヌードル\"}" },
      { "position": "below main title pill", "text": "醤油味" },
      { "position": "center yellow jagged burst", "text": "お湯を注いで 3分!" },
      { "position": "mid-right floating text", "text": "{argument name=\"catchphrase text\" default=\"だし香る、やさしい味わい!コクうまスープ!\"}" },
      { "position": "bottom-left speech bubble", "text": "巫女ちゃんおすすめ!" },
      { "position": "bottom-center text", "text": "小腹がすいたらこれ!" },
      { "position": "bottom-right red price box", "text": "{argument name=\"price text\" default=\"198円\"}" }
    ]
  }
}
Reference

Fantasy Manga Character Introduction Page

Generates a 6-panel manga page introducing a party of 5 fantasy characters with dialogue and name boxes.

Af らけしで / Mizmic Studio
16.4.2026
GPT Image 2 Prompt
{
  "type": "manga page",
  "style": "{argument name=\"art style\" default=\"black and white manga screentone\"}",
  "character_count": 5,
  "panel_count": 6,
  "layout": {
    "panels": [
      {
        "position": "top, full width",
        "character": "Beatrice, long blonde hair, dark hooded cloak, pointing forward",
        "text": ["伝説の遺跡に知識と仲間の力で挑むの!準備はいい?", "さあ、行くわよ!", "未来人書学者 {argument name=\"character 1 name\" default=\"ベアトリス\"}"]
      },
      {
        "position": "middle left",
        "character": "Nova, long black hair, elf ears, black dress, arms crossed",
        "text": ["面倒事は嫌いだけど…付き合ってあげる。", "魔王の娘 {argument name=\"character 2 name\" default=\"ノヴァ\"}"]
      },
      {
        "position": "middle right",
        "character": "Crim, short hair, armored corset, holding sword",
        "text": ["もちろん!魔物を倒してみんなで勝つよ!", "勇者 {argument name=\"character 3 name\" default=\"クリム\"}"]
      },
      {
        "position": "bottom left, upper",
        "character": "Lilia, witch hat, holding staff",
        "text": ["わくわく!!私、役に立ちたい!たくさん学んで成長するよ!", "冒険者の卵 リリア"]
      },
      {
        "position": "bottom right, tall vertical",
        "character": "Camilla, dragon horns, wings, tail, black armor, large sword",
        "text": ["私の力、必要なら使う。", "ドラゴン娘 カミラ"]
      },
      {
        "position": "bottom left, lower",
        "description": "Group shot of all 5 characters standing in a landscape",
        "text": ["出発だ!", "ザッ", "個性豊かな仲間たちと共に伝説への第一歩が今、始まる――!"]
      }
    ],
    "footer": "{argument name=\"ending text\" default=\"おわり\"}"
  }
}
Reference

Elegant Photorealistic Female Portrait

Generates a highly detailed, photorealistic portrait of a woman in an elegant setting with customizable features and attire.

Af かず|SE×AI副業
16.4.2026
GPT Image 2 Prompt
A photorealistic portrait of a {argument name="subject" default="beautiful young Asian woman"} with {argument name="hair style" default="long dark wavy hair with side-swept bangs"}. She wears an {argument name="outfit" default="elegant black off-the-shoulder satin dress"} and pearl stud earrings, smiling gently at the camera. The background is a {argument name="background setting" default="blurred luxurious interior with warm bokeh lights"}. Cinematic lighting, highly detailed.
Reference

Photorealistic Portrait of a Young Woman

Generates a highly detailed, photorealistic portrait of a young woman with customizable features, clothing, and background.

Af かず|SE×AI副業
16.4.2026
GPT Image 2 Prompt
A photorealistic, high-quality portrait of a beautiful young {argument name="nationality" default="Japanese"} woman. She has {argument name="hair style" default="long black wavy hair with bangs"}, dark brown eyes, fair skin, and a {argument name="expression" default="gentle smile"} while looking directly at the camera. She is wearing a {argument name="clothing" default="simple white blouse"}. The image features soft, flattering portrait lighting and a shallow depth of field, set against a {argument name="background" default="blurred warm indoor setting"} with beautiful bokeh. Shot on an 85mm lens, highly detailed.
Reference

Photorealistic Neon Tokyo Street Scene

Generates a highly detailed, photorealistic night view of a bustling Japanese city street with customizable neon signs and billboards.

Af EARLの医学&AIノート
16.4.2026
GPT Image 2 Prompt
A photorealistic night street photography shot of a bustling {argument name="city location" default="Tokyo"} street, heavily illuminated by densely packed vertical neon signs and billboards. On the left, a bright pink sign prominently reads "{argument name="pink sign text" default="カラオケ"}" next to a white sign reading "牛角 焼肉". On the right, prominent signs include a yellow one reading "{argument name="yellow sign text" default="まんが喫茶 4F"}", a white one reading "東南 本館 2F", and a red one reading "{argument name="red sign text" default="中華食堂 一番館 B1"}". In the center distance, a large blue billboard displays "{argument name="billboard text" default="open TOKYO"}" above a digital screen showing a person with the text "YUNIKA VISION". The street level is crowded with the backs of pedestrians' heads walking through the vibrant, glowing urban canyon. The lighting is high contrast with rich neon colors reflecting off the surroundings.
Reference

Photorealistic Shibuya Street Selfie

Generates a photorealistic selfie of a young woman on a Japanese city street with customizable text on signs and buildings.

Af Kouji Fujii|AI × Business
16.4.2026
GPT Image 2 Prompt
A photorealistic selfie of a young Japanese woman standing on a sunny city street in {argument name="location" default="Shibuya, Japan"}. She has a soft smile, fair skin, light makeup, and {argument name="hair style" default="long wavy brown hair with see-through bangs"}. She is wearing a {argument name="clothing" default="white textured blouse"} with a delicate necklace and a beige shoulder bag strap visible. The background features a bustling urban environment with a crosswalk, pedestrians on the sidewalk, and a large white commercial building displaying the text {argument name="building text" default="MODI"} at the top along with a digital billboard. On the left side of the frame, a vertical street sign clearly displays the text {argument name="street sign text" default="渋谷区 神南一丁目 8"}. The image has a bright, natural daylight aesthetic typical of a casual social media photo.
Reference

Handwritten Japanese Study Notes

A photorealistic top-down view of an open notebook with handwritten Japanese study notes and a pencil, useful for educational or aesthetic mockups.

Af Kouji Fujii|AI × Business
16.4.2026
GPT Image 2 Prompt
A top-down photorealistic image of an open lined notebook resting on a smooth wooden desk. A dark green HB pencil with a silver ferrule and white eraser lies diagonally on the desk to the right of the notebook. The notebook pages are filled with neat, handwritten text in pencil, resembling a student's study notes. On the left page, the top left corner reads {argument name="date" default="2024年5月20日(月)"} above {argument name="subject" default="国語 「枕草子」"}. Below this is a rectangular boxed heading reading {argument name="left page heading" default="清少納言のものの見方"}, followed by exactly three bulleted sentences: one about valuing the changes in nature and seasons, one about finding beauty and amusement in small everyday things, and one about being honest with one's senses while having a sense of humor. Further down is a cloud-shaped border containing a heading translated as 'Words that left an impression', followed by a famous classical quote about spring mornings and a brief explanation below it marked with an arrow. On the right page, the top section has the heading {argument name="right page heading" default="〈現代とのちがい〉"} with exactly two bulleted points: one noting that the perception of seasons is much more delicate than today, and another stating that the perspective is sensory and poetic. This is followed by an arrow pointing to a concluding thought about wanting to cherish this sensibility. Below this is another cloud-shaped border containing a heading translated as 'Summary' and a short paragraph about how the 1000-year-old text still resonates today and the importance of carefully observing nature. At the bottom right of the page, there is a small, simple line drawing of a leafy plant stem next to a scalloped thought bubble containing the text {argument name="final thought" default="感性をみがくって、素敵なことだなあ。"}. The lighting is soft and natural, highlighting the texture of the paper and the graphite pencil marks.
Reference

Mars Rover Discovery Photo

Generates a photorealistic, raw space agency style image of a Mars rover discovering alien artifacts, complete with a file name overlay.

Af Scott Muller
16.4.2026
GPT Image 2 Prompt
A photorealistic, raw space agency photo of a {argument name="setting" default="Martian landscape"} with red dirt, scattered rocks, and a hazy orange sky. In the middle ground, {argument name="objects" default="two dark stone tablets covered in ancient carved hieroglyphs"} are jutting out of the ground at a slight angle. In the immediate foreground, the distinct {argument name="foreground element" default="shadow of a Mars rover"} is cast onto the rocky terrain, indicating the perspective of the photo. Across the top edge of the image, there is a plain white text overlay resembling a raw file name reading "{argument name="overlay text" default="ZCAM_0847_0734291854_678RAD_N0412172ZCAM08050_1100LUJ01.png"}". The lighting is harsh and realistic, mimicking actual extraterrestrial surface photography.
Reference

Google Street View Anomaly Screen Photo

Generates a realistic photograph of a computer screen displaying a Google Street View interface featuring a surreal or out-of-place architectural anomaly.

Af Scott Muller
16.4.2026
GPT Image 2 Prompt
{
  "type": "photograph of a computer monitor displaying a Google Maps Street View interface",
  "scene": {
    "environment": "{argument name=\"environment\" default=\"barren desert landscape under a clear blue sky\"}",
    "subject": "{argument name=\"subject\" default=\"massive ancient stone wall with perfectly fitted cyclopean masonry blocking a dirt road, with a rectangular doorway cut through the center\"}",
    "foreground": "shadow of a Google Street View car with a 360-degree camera mounted on top cast onto the dirt road"
  },
  "ui_elements": {
    "browser_bar": "URL bar at the top showing google.com/maps with latitude and longitude coordinates",
    "top_left_panel": "black semi-transparent info box with text 'Unnamed Road', '{argument name=\"region\" default=\"Atacama Region\"}', and 'Street View - Sept 2022'",
    "bottom_left_panel": "minimap inset with a yellow Pegman icon",
    "bottom_right_panel": "minimap inset showing a blue route line, Pegman, zoom controls, and text '{argument name=\"distance text\" default=\"340 km from nearest town\"}'",
    "bottom_bar": "Google logo in the bottom center, compass icon on the right, and copyright/capture date text along the bottom edge"
  },
  "style_details": "visible screen glare and slight monitor distortion to simulate a photograph taken of a physical screen with a smartphone"
}
Reference

Paranormal Trail Camera Encounter

Generates a spooky, infrared trail camera image featuring wildlife, a mysterious glowing orb, and realistic camera data overlays.

Af Scott Muller
16.4.2026
GPT Image 2 Prompt
A black and white infrared trail camera photo taken at night in a dense coniferous forest. In the foreground on the left, a large black bear is walking past, appearing slightly motion-blurred. In the center of the clearing, there is a perfectly circular, dark, barren patch of dirt on the forest floor. Hovering just above the ground at the far edge of this dark circle is a bright, glowing, spherical orb of light. The image features a grainy night vision aesthetic with visible underbrush, pine tree trunks, and a tree stump in the bottom right corner. A black data bar runs across the bottom edge containing white text: on the far left, an oval logo reading "{argument name="camera brand" default="RECONYX"}", followed by the timestamp "{argument name="timestamp" default="03:14:22 11-OCT-2023"}", then "{argument name="temperature" default="TEMP: 4°C"}", and on the far right, "{argument name="trigger info" default="TRIGGER: MOTION DUAL TRIGGER"}".
Reference

Satellite Anomaly Interface Mockup

Generates a realistic web interface for satellite imagery featuring a mysterious geometric anomaly, timeline thumbnails, and UI controls.

Af Scott Muller
16.4.2026
GPT Image 2 Prompt
{
  "type": "satellite imagery web interface mockup",
  "main_display": {
    "imagery": "greyscale satellite view of ocean clouds featuring a {argument name=\"anomaly shape\" default=\"massive, perfectly geometric dark triangle\"} in the center",
    "annotation": "red handwritten text '{argument name=\"annotation text\" default=\"Natural formation???\"}' with a red arrow pointing to the anomaly",
    "overlay": "faint blue latitude and longitude grid lines with coordinate labels like 40N, 30N, 160W"
  },
  "ui_layout": {
    "top_header": {
      "left_section": "NOAA logo, text '{argument name=\"satellite name\" default=\"GOES-18 ABI CONUS - Sector View\"}', '{argument name=\"timestamp\" default=\"2024-03-15 14:32:20 UTC\"}', and 'Band 2 (0.64µm) - Visible Light'",
      "right_section": "4 navigation icons with labels: Home, Share, Help, Settings"
    },
    "left_sidebar": {
      "count": 7,
      "items": ["Layers", "Products", "Basemap", "Measure", "Location", "Legend", "Download"]
    },
    "bottom_panel": {
      "timeline": {
        "controls": "Play button, left/right arrows, text '6 Scenes', '6 of 6'",
        "thumbnails": {
          "count": 6,
          "description": "sequential satellite images showing the anomaly's progression, with hourly timestamps from 08:32 UTC to 14:32 UTC"
        }
      },
      "data_readout": {
        "coordinates": "{argument name=\"coordinate text\" default=\"Lat/Lon: 28.12°N, 162.08°W\"}",
        "elevation": "Elevation: 0.5°",
        "scale": "Distance Scale bar from 0 to 1000 km"
      }
    }
  }
}
Reference

Intimidating Press Conference Meme

A photorealistic satirical image of a superhero intimidating a tech CEO at a White House press briefing.

Af Matthew Berman
16.4.2026
GPT Image 2 Prompt
A photorealistic, cinematic shot set in the {argument name="location" default="White House press briefing room"}. At the podium sits {argument name="seated character" default="Sam Altman"}, wearing a dark suit and blue tie, looking visibly uncomfortable and nervous, staring blankly ahead. Standing directly behind him is {argument name="standing character" default="Homelander from The Boys"}, wearing his signature blue superhero suit with red gloves and gold eagle shoulder pads. The standing character has one red-gloved hand resting heavily and intimidatingly on the seated character's shoulder, while using his other hand to drink from a {argument name="beverage" default="glass bottle of milk"} with a confident, slightly unhinged smirk. In the background, there is a US flag on the left and a blue oval White House seal on the wall behind them. The podium has a sign reading "THE WHITE HOUSE WASHINGTON".
Reference

Fast Food Burger Advertisement Poster

Generates a professional food photography poster for a burger meal with customizable promotional text and branding.

Af Aditya ⚡Rao
16.4.2026
GPT Image 2 Prompt
A commercial food photography poster for a {argument name="burger type" default="shrimp burger"}. The central burger features a glossy brioche bun, lettuce, white sauce, spicy orange mayo, two grilled shrimp, and a thick crispy breaded patty. It rests on parchment paper on a wooden table, flanked by seasoned french fries on the left and two fried shrimp pieces on the bottom right. A blurred glass of iced cola and a faint {argument name="brand name" default="LOTTERIA"} logo appear in the dark background. The parchment bears a circular "SHRIMP BURGER" stamp. Top left Korean text reads {argument name="top left text" default="탱글한 통새우살이 입안 가득"}. The large central headline is {argument name="main headline" default="통새우 크런KIM버거"} with a small orange shrimp illustration. Below it is the subtitle {argument name="subtitle text" default="매콤바삭, 육즙가득! 올봄, 새우버거의 기준이 바뀐다!"}. The bottom left corner shows the {argument name="brand name" default="LOTTERIA"} logo. Warm, professional studio lighting.
Reference

Dark Fantasy Game Event UI Mockup

Generates a game event landing page featuring impasto-style combat artwork and localized UI panels for missions and rewards.

Af Aditya ⚡Rao
16.4.2026
GPT Image 2 Prompt
{
  "type": "game event landing page UI mockup",
  "art_style": "{argument name=\"art style\" default=\"heavy impasto oil painting, dark fantasy\"}",
  "background_artwork": {
    "description": "dynamic combat scene with swirling dark and red energy",
    "character_count": 4,
    "characters": [
      "top: white-haired man casting blue spell",
      "middle-left: dark-haired man summoning shadow energy",
      "right: pink-haired man throwing red energy punch",
      "bottom-left: brown-haired woman wielding hammer"
    ]
  },
  "ui_layout": {
    "top_left": {
      "type": "event header",
      "elements": [
        {"small_text": "{argument name=\"subtitle\" default=\"리그 오브 레전드 X 주술회전\"}"},
        {"large_title": "{argument name=\"main title\" default=\"주술사의 결전\"}"},
        {"date_text": "{argument name=\"event date\" default=\"이벤트 기간: 2024.07.18 - 2024.08.28\"}"},
        {"description": "소환사의 협곡에 주술회전이 강림했다. 임무를 완료하고 한정 보상을 획득해 보세요!"},
        {"button": "{argument name=\"button text\" default=\"이벤트 참여\"}"}
      ]
    },
    "bottom_left": {
      "type": "mission panel",
      "header": "일일 임무 0/8",
      "mission_count": 2,
      "missions": [
        {"text": "협곡에서 게임 1회 플레이", "progress": "0/1", "reward": "100"},
        {"text": "적 챔피언 15회 처치 관여", "progress": "0/15", "reward": "200"}
      ]
    },
    "bottom_right": {
      "type": "rewards panel",
      "labels": ["주술회전 패스", "한정 스킨 보상"],
      "icon_count": 4,
      "icons": [
        "blindfolded man",
        "pink-haired boy",
        "brown-haired girl",
        "dark monster"
      ]
    }
  }
}
Reference

Live Stream Interface Mockup

Generates a realistic live streaming interface featuring a host, live chat overlay, topic cards, and video player controls.

Af Aditya ⚡Rao
16.4.2026
GPT Image 2 Prompt
{
  "type": "live stream interface mockup",
  "subject": {
    "description": "{argument name=\"subject appearance\" default=\"young Korean woman, long dark wavy hair, light blue button-up shirt\"}",
    "accessories": "silver cross necklace, black broadcast microphone on boom arm",
    "pose": "speaking to camera, sitting in grey ergonomic chair"
  },
  "background": "{argument name=\"background vibe\" default=\"cozy room with warm lighting, shelf with YouTube play buttons\"}",
  "layout": {
    "top_bar": {
      "title": "{argument name=\"stream title\" default=\"AGI 시대는 우리에게 무엇을 가져올까? | 기술, 일자리, 인간의 의미\"}",
      "badge": "LIVE"
    },
    "left_chat": {
      "count": 7,
      "messages": [
        {"user": "루나_1023", "text": "오늘 주제 진짜 기대돼요!"},
        {"user": "미래_탐험가", "text": "AGI가 인간보다 똑똑해지면 우리는 어떤 존재가 될까요?"},
        {"user": "코드네임A", "text": "일자리 얘기도 해주실 수 있나요? 요즘 너무 불안해서..."},
        {"user": "별빛사랑", "text": "루나님 목소리 들으면서 같이 생각해봐요"},
        {"user": "AI_조련사", "text": "AGI는 도구일까, 동반자일까?"},
        {"user": "냥냥펀치", "text": "와! 시작부터 흥미진진하다!"},
        {"user": "철학하는왕자", "text": "'인간의 의미'... 벌써부터 깊이 있는 이야기 예상됩니다"}
      ]
    },
    "bottom_left_card": {
      "header": "TODAY'S TOPIC",
      "main_text": "{argument name=\"topic title\" default=\"AGI 시대, 우리는 어디로 가는가?\"}",
      "sub_text": "기술 · 일자리 · 인간의 의미"
    },
    "bottom_controls": {
      "elements": ["red progress bar", "play icon", "volume icon", "라이브", "settings icon", "fullscreen icon"]
    }
  }
}

YouTube Unboxing Thumbnail Prompt

A prompt designed for GPT-Image-2 to create a YouTube thumbnail for an unboxing video, specifically focused on a humorous or dramatic theme like opening overdue bills.

Af とらの
16.4.2026
GPT Image 2 Prompt
Thumbnail for a YouTube unboxing video, a video of {argument name="topic" default="opening all overdue bills"}, {argument name="quantity" default="100 in a row"}
Reference

3-Panel Duct Tape Meme Comic

Generates a 3-panel comic showing a subject eating a fruit and taping the peel to a wall, parodying modern art and tech companies.

Af noel.index
16.4.2026
GPT Image 2 Prompt
{
  "type": "3-panel comic layout",
  "subject": "{argument name=\"subject\" default=\"Sam Altman\"}",
  "object": "{argument name=\"object\" default=\"banana\"}",
  "layout": {
    "structure": "left side split horizontally into two panels, right side is one large vertical panel",
    "panels": [
      {
        "number": "1",
        "position": "top-left",
        "description": "The subject is smiling widely and eating the object in an office setting."
      },
      {
        "number": "2",
        "position": "bottom-left",
        "description": "The subject is seen in profile, using a strip of silver duct tape to attach the peel of the object to a plain white wall."
      },
      {
        "number": "3",
        "position": "right-half",
        "description": "Close-up of the object's peel duct-taped to the white wall. Below it is the {argument name=\"company logo\" default=\"OpenAI\"} logo and text. Below the logo is another piece of duct tape with the handwritten text '{argument name=\"tape text\" default=\"Duct tape\"}'."
      }
    ]
  }
}

Historical Figure X Post Design

A prompt to generate an X (Twitter) UI layout featuring a historical figure like Sakamoto Ryoma discussing contemporary issues.

Af IT navi
16.4.2026
GPT Image 2 Prompt
Create an X post page featuring {argument name="person" default="Sakamoto Ryoma"} talking passionately about {argument name="topic" default="the future of Japan"}
Reference

Open-World Action Game HUD Screenshot

Generates a realistic video game screenshot featuring a high-speed car chase, complete with customizable HUD elements, subtitles, and a minimap.

Af Dr. Beaky
16.4.2026
GPT Image 2 Prompt
{
  "type": "video game gameplay screenshot",
  "scene": {
    "setting": "wet coastal highway bridge at sunset, distant neon city skyline",
    "action": "high-speed police chase with motion blur and sparks",
    "vehicles": [
      "1 red sports car with spoiler, license plate {argument name=\"license plate\" default=\"VICECITY\"}",
      "1 police car crashing on the right",
      "1 black car crashing on the left",
      "1 police helicopter with spotlight overhead"
    ],
    "environment_signs": [
      "green highway sign: VCI Airport Ambrosia",
      "green highway sign: Downtown Vice City Peacock Bay",
      "pink billboard: IT CURES EMOTIONS!"
    ]
  },
  "layout": {
    "sections": [
      {
        "title": "controls tutorial",
        "position": "top-left",
        "count": 2,
        "labels": ["Hold RT to accelerate.", "Hold LT to brake or reverse if stopped."]
      },
      {
        "title": "player status",
        "position": "top-right",
        "count": 2,
        "labels": ["5 hollow stars", "{argument name=\"money amount\" default=\"$2,394,500\"}"]
      },
      {
        "title": "navigation",
        "position": "bottom-left",
        "count": 4,
        "labels": ["circular minimap", "E 13:57", "VCI Airport", "0.7mi"]
      },
      {
        "title": "subtitles",
        "position": "bottom-center",
        "count": 1,
        "labels": ["{argument name=\"subtitle text\" default=\"Jason: Cops all over us! Lose 'em, we gotta get Lucia outta here!\"}"]
      },
      {
        "title": "watermark",
        "position": "bottom-right",
        "count": 1,
        "labels": ["{argument name=\"game logo\" default=\"Grand Theft Auto VI\"}"]
      }
    ]
  }
}
Reference

First-Person Fantasy RPG Screenshot

Generates a highly detailed, first-person perspective video game screenshot featuring customizable UI elements, equipped weapons, and a sprawling fantasy landscape.

Af Dr. Beaky
16.4.2026
GPT Image 2 Prompt
{
  "type": "first-person RPG video game screenshot",
  "scene": {
    "environment": "{argument name=\"city style\" default=\"ancient ruined Dwemer city in a deep rocky canyon\"}",
    "lighting": "{argument name=\"lighting and atmosphere\" default=\"golden hour sunset, hazy, warm orange glow, dusty atmosphere\"}",
    "details": "cascading waterfalls, towering stone pillars, domed structures with brass accents, rugged cliffs"
  },
  "first_person_view": {
    "left_hand": "{argument name=\"left hand equipment\" default=\"round wooden and metal shield\"}",
    "right_hand": "{argument name=\"right hand equipment\" default=\"long steel sword\"}"
  },
  "ui_overlay": {
    "count": 4,
    "components": [
      {
        "position": "top center",
        "description": "horizontal compass bar with 'N' and a marker"
      },
      {
        "position": "middle left",
        "description": "floating quest marker with text",
        "text": "{argument name=\"quest objective\" default=\"REACH THE DWEMER CITY OF KALJOR\"}"
      },
      {
        "position": "bottom left",
        "description": "3 stacked resource bars (red 236/236, blue 142/142, green 183/183)"
      },
      {
        "position": "bottom right",
        "description": "2 circular quick-slot icons showing a fire spell and a bow"
      }
    ]
  }
}
Reference

Dark Fantasy RPG Boss Fight Screenshot

Generates a video game screenshot of a dark fantasy boss encounter complete with a customizable HUD and boss design.

Af Dr. Beaky
16.4.2026
GPT Image 2 Prompt
{
  "type": "video game screenshot",
  "scene": {
    "setting": "shallow dark water with gothic city ruins in the background",
    "atmosphere": "dark fantasy under a {argument name=\"moon style\" default=\"massive red blood moon\"}",
    "player_character": "viewed from behind, wearing a dark trench coat and tricorn hat, holding a {argument name=\"player weapon\" default=\"jagged sword\"} and a firearm",
    "boss": "{argument name=\"boss appearance\" default=\"towering mass of dark, tangled roots and flesh with glowing eyes\"}"
  },
  "layout": {
    "sections": [
      {
        "position": "top-left",
        "title": "Player Stats",
        "count": 3,
        "labels": ["red health bar", "green stamina bar", "white bar"],
        "inventory": {
          "count": 3,
          "labels": ["red potion: 20", "silver item: 20", "{argument name=\"selected item\" default=\"Beast Blood Pellet\"}: 7"]
        }
      },
      {
        "position": "top-right",
        "title": "Counters",
        "count": 2,
        "labels": ["currency symbol: 3920", "eye symbol: 19"]
      },
      {
        "position": "bottom-center",
        "title": "Boss Health",
        "count": 1,
        "labels": ["{argument name=\"boss name\" default=\"Kos, Reborn\"}"]
      }
    ]
  }
}
  • Forrige
  • 1
  • More pages
  • 56
  • 57
  • 58
  • More pages
  • 64
  • Næste